Dongguan Zhongjing Semiconductor Technology Co., Ltd. was established on October 22, 2010. It is mainly engaged in the design, research and development, production and sales of semiconductor materials, semiconductor epitaxial wafers, chips, semiconductor components, information optoelectronic products, general mechanical equipment, testing equipment and accessories. , semiconductor software, etc.
The project content is the second phase (point measurement point) electromechanical engineering of the plant of Zhongjing Semiconductor. According to the construction drawings and various technical requirements and construction specifications of the semiconductor industry, the construction is reasonably arranged to ensure the completion of the project on time and quality.
The floor of the production area of each layer of the project is made of anti-static PVC, and the anti-static manual rock wool color steel plate is used for the car partition.
The pipelines in the workshop are arranged in the line trough (distribution, electrostatic grounding, vacuum, air pressure, and all the network installations in the network). After the equipment is in place, the workshop is clean and tidy, and it is also conducive to daily cleaning.
Each vacuum branch line in the workshop is equipped with a vacuum tank and a negative pressure gauge, and a pressure gauge is installed at the end of each air pressure branch pipe in the workshop.
Stainless steel door frame trimming at the expansion joint and stainless steel floor protection (protection of steel plate and PVC floor jointed by expansion joints on the logistics channel)
One floor leads to the second floor clean stair walkway (PVC anti-static floor), with color-clear anti-slip strips and PVC floor upper wall finishing treatment
The LED clean flat lamp is uniformly used in the workshop, which is 4CM less than the thickness of the conventional beveled clean lamp. The appearance is fashionable and the brightness is correspondingly improved
The outer raised part of the suspended ceiling in the workshop is treated by the outer arc edge
The air conditioning system of this project adopts MAU+RCU mode, and each MAU and RCU has a separate control interface.
PLC local control interface
The project is currently in the final stage and is expected to be put into production at the end of November.